Deye SUN-100/125K-SG02HP3-EU-GM10 | 100–125kW Three-Phase HV Hybrid Inverter
From 2.049.200 Ft
-
Battery
160-1000V -
MPPTs
10 -
Max. efficiency
98.7% -
Parallel
10

Hybrid plant
100 or 125 kW on one hybrid.
A three-phase high-voltage hybrid for factories, warehouses, and commercial buildings. PV and storage run together on the same unit. Max. efficiency is 98.7%, Euro efficiency is 98.1%, and MPPT efficiency stays above 99%.
- 100 / 125 kW rated AC power
- 98.7% max. efficiency
- 98.1% Euro efficiency

PV layout
Ten trackers for a mixed roof.
Ten MPPTs, two strings on each, 42 A per tracker. A warehouse, a carport, and an east-west field can each hold their own voltage. Max. PV input is 1000 V, and the MPPT window is 150–850 V.
- 10 MPPTs independent trackers
- 20 strings 2 per MPPT
- 42 A per tracker

Storage
Two battery inputs at 100 A.
Lithium batteries from 160 V to 1000 V connect on two inputs at 100 A each. Charging follows the BMS. Use both inputs to move daytime solar into the afternoon peak on a 100 kW or 125 kW site.
- 160–1000 V battery voltage
- 100+100 A charge / discharge
- 2 inputs BMS self-adaption

Expansion
Grow the plant in stages.
Up to 10 inverters can run in parallel for on-grid and off-grid operation. Batteries can be paralleled as well. Start with one 100 kW or 125 kW unit and add cabinets as the load grows.
- 10 inverters in parallel
- On-grid and off-grid same architecture
- Batteries in parallel

Time of use
Six windows in the working day.
Charging and discharging can be set across six periods. Fill the battery when the site tariff is low, and discharge when the process load is high.
- 6 periods each day
- Charge low-tariff hours
- Discharge process load

Retrofit
Leave the existing array in place.
AC coupling adds this hybrid inverter to a solar system that is already running. The original PV stays in service. The new unit brings battery storage for peak shaving or backup.
- AC coupling retrofit
- Existing PV stays in service
- Battery added for the site

Backup
The generator fills the battery.
Energy from a diesel generator can be stored in the battery when the grid is down. Off-grid peak power is 1.5 times rated power for 10 seconds, for a motor start while the generator covers the longer outage.
- Diesel into the battery
- 1.5× rated off-grid peak
- 10 s peak duration

Outdoor plant
Outdoor cabinet, surge-protected.
Ingress protection is IP65, so the cabinet can sit outdoors beside a switch room. Type II surge protection covers AC and DC. Intelligent air cooling carries the cabinet through a hot working day.
- IP65 outdoor install
- Type II AC and DC surge
- Air cooling intelligent
Technical data
| Parameter | SUN-100K-SG02HP3-EU-GM10 | SUN-125K-SG02HP3-EU-GM10 |
|---|---|---|
| Rated AC active power | 100000 W | 125000 W |
| Max. AC apparent power | 110000 VA | 135000 VA |
| Max. PV input power | 160000 W | 200000 W |
| Battery voltage | 160–1000 V | 160–1000 V |
| Max. charge/discharge current | 100+100 A | 100+100 A |
| MPP trackers / strings | 10/2+2+2+2+2+2+2+2+2+2 | 10/2+2+2+2+2+2+2+2+2+2 |
| MPPT voltage range | 150–850 V | 150–850 V |
| Max. PV input voltage | 1000 V | 1000 V |
| Max. operating current per MPPT | 42 A | 42 A |
| Max. efficiency | 98.7% | 98.7% |
| Parallel | Max. 10, on-grid and off-grid | Max. 10, on-grid and off-grid |
| Ingress protection | IP65 | IP65 |
| Cabinet size (W×H×D) | 734×1091×344 mm | 734×1091×344 mm |
| Weight | 161.7 kg | 161.7 kg |
