Critical-load transfer
Fast switching for critical loads.
On-grid / off-grid transfer in <10 ms with matched PCS and batteries. Continuous off-grid load should stay within about 70% of PCS rated power — not diesel start time, and not absolute zero interruption for every device.
- <10 ms transfer
- ≤70% PCS continuous off-grid
